HESCOM in a press release has stated that there would be NO POWER on Sunday April 8 in the entire city including rural areas from 9 am to 6 pm as they will take up some repair works.
View PostPay HESCOM bill by ECS

After the introduction of Any Time Payment machines for electricity bills, HESCOM now has introduced the ECS – Electronic Clearing system mode for payment of bills. In this case a consumer can fill the ECS form and give his/her mandate to HESCOM to automatically withdraw the monthly bill from a mentioned account. One can also [...]
View Post belgaum, bill, ecs, Electricity, hescom, mode, paymentNo power for three hours

A new schedule of load shedding has been released by HESCOM and now there will be a THREE hours of power cuts in the city which would include Two hours in the day and one hour in the evenings. This is expected to be until February. The city needs 140 to 150 MW where as [...]
View Post belgaum, hescom, load shedding, power cuts, scheduleLoad shedding now down to two hours with schedule

The new load shedding schedule announced by HESCOM on 29-09-2011 Shivbasav Nagar, Fort Road, Cantonment, Shahpur, Adarsh Nagar, 8 am to 10 am Sadashiv Nagar, Shetty Galli, Hindwadi, Patil Galli, 10 am to 12 pm Vaibhav Nagar, civil Hospital, Khade Bazar, Maruti Galli, Udyambag, Vadgaon, Hanuman Nagar 12 pm to 2 pm MM extn, Dharwad [...]
View Post belgaum, hescom, load shedding, power cuts, schedule, time tableLoad shedding
It is back, load shedding in the city and as HESCOM does it best unscheduled. Currently the power cut timings vary from one hour to three hours and much more worse in the rural areas. The load shedding is on due to shortage in power production. City needs 175MW where as we are getting about [...]
View PostBelgaum One to be inaugurated tomorrow
The long pending Belgaum one centers have got a “Muhurat” of August 25, and same will inaugurated by CM Yedurappa. Belgaum one centers were sanctioned long back on the same lines as Bangalore One success. These centers will be a one stop single window center for major government related work and various bill payments. Govaves, [...]
View Post belgaum, belgaumone, centers, oneLoad Shedding again
In spite of good rains and relief from power cuts for about 15 days, HESCOM is back with its routine load shedding of SIX hours in city and 12 hours in rural areas. Load shedding is necessary as there are problems with the power production. Belgaum is getting about 90 MW where it actually needs [...]
View Post belgaum, power cutsSSI owners block roads for power supply

In the past week or so, Belgaum has been witnessing some erratic power supply by HESCOM. Power is cut at any time and the entire timings come up to 6 to 8 hours. The Small Scale industries association did a Rata Roko and blocked the road for a while in protest of this erratic power [...]
View PostLoad shedding game
The supply of power to Belgaum in the recent past has been reduced and which has caused for load shedding of 4 hours in city areas and 12 hours in rural areas. In the past one month two time tables have been changed. And here is the latest one: Slot 1: 9am to 11am & [...]
View Post load shedding, timeKarnatakas Power shock by tariff hike

Be ready for another shock from the Karnataka govt. All prices of all essential commodities have now gone past the sky to the universe and to give a boost to the same take off the Karnataka Electricity Regulatory Commission (KERC), on Wednesday, increased the power tariff in the State by an average of 34.16 paise/ [...]
View Post hescom, hike, power, rates, traiffLoad shedding is back for four hours only

Its back! You will love this! Most of India is used to it! What is it? Load shedding, power cuts! HESCOM yesterday announced a 4 hour load shedding in Belgaum for both domestic and industrial areas. The load shedding will be done in 3 slots; One hour two slots and 2 hour one slot in [...]
View Post belgaum, load shedding, time table

Voice
Real Estate