lcds-Belagavi-news

Hescom resumes Power play for 2 hours

Photo of author

After the acute power shortage in May and June when there was less water in the hydro power plants, now even after all the hydro power plants are full to capacity the state is facing a power shortage and hence a 2 hours power cuts in urban areas & 10 hours in rural areas is being implemented from today.

 The new time table for the load shedding has been announced.

Belgaum city will face power cuts in two time slots of 9 am to 10 am and 7 pm to 8pm.

Industrial areas will face power cuts 7am to 8am and 6pm to 7pm. 

Leave a Comment