HESCOM has started laying underground (UG) cables in the city to prevent dangling wires, which pose danger to residents, especially during the monsoon. This Project envisages for Conversion of existing 11 KV Over Head Line to Under Ground cable system in Belagavi City. As of September end about 10 kms of Under Ground Cables have been laid in the […]
Electricity
Load Shedding Schedule
Load Shedding Schedule Belagavi This is bound to change to ensure power supply in the night slot. Area Slot 1 Slot 2 Slot 3 Morning Morning-Afternoon Night Guruprasad Colony 7 to 8 10 to 2 7 to 8 Piranwadi 7 to 8 10 to 2 7 to 8 Hindalga 7 to 8 10 to 2 […]
3 hours of load shedding from today
For the very first time with less rainfall HESCOM has decided to have a THREE hours power cut in Belagavi city. 2 hours of load shedding in the morning slot from 7.30 AM to 11.30 PM and ONE hour in the evening slot from 7 pm to 10 pm. At present there is a […]
HESCOM helpline numbers for Belgaum
The Hubli Electricity Supply Company has launched special helpline numbers for various regions in the city on which citizens can complain during the monsoon season. Numbers have changed and hence we will update the same.
Power cut schedule
With shortage in supply of power in the state, HESCOM has decided to have 4 hour power cut in Urban areas, 6 hours in industrial areas and 12 hours in rural areas. In Belgaum city the power cut schedule will be as follows and this will depend on the supply of power, if there is […]