belagavi

First major project under smart city Command & Control center to be inaugurated today

1
belagavi

This is the first major project under the Belagavi Smart city the Command & Control centre will be inaugurated by Chief Minister B S Yediurappa on 29-01-2020.

Bharat Electronics limited which was awarded the contract to build the Command center for the Belagavi smart city for Rs.46 crore is making good progress at CTS No. 3933/A3, Visvesvaraya Nagar in Belagavi City.

belagavi

The command center will be one place from where traffic, CCTV, Power, street lights and other services would be integrated into a single command room.

command-centerMaster System Integrator (MSI)/System Integrator (SI) to implement the said ICT interventions.

City Surveillance & Ambulance & Fire

Integrate, Command and Control

1. E-governance (Property Tax, Automatic Building Permission Approval System, birth and death registration, public grievance redressal system, fund-based accounting system (etc)-Present integration 2. Smart Parking (for future integration)

3. Smart Lighting (for future integration)

4. Smart UGD (for future integration)

5. Smart Energy Management (for future integration)

6. Geospatial Database Management (including Land Management System and Utilities Mapping )-Present Integration

7. Fire &Ambulance

Level 3: Implement, Command, Control and Fully Operate

Smart city command centre1. Smart Water

2. ICT based solid waste management with RF at household and community level

3. Intelligent Traffic Management System (Adaptive Traffic Control System)

4. Intelligent Transport System (ITS)

5. Intelligent Pole (with environmental sensors, public address system, variable messaging system, digital billboard, panic button).

After establishing the above said solutions, the bidder is expected to Operate and Maintain the said ICT interventions for a period of 5 years

Main objective of the project is to break silos in the city with in the departments and across the departments. Also to install appropriate check points for solutions implemented, so that the services delivered to the public are to the at most satisfaction of public. SI shall be responsible to carry out the detailed survey prior to submission of bid for the complete solution component requirement in order to finalize infrastructure requirement, network bandwidth requirement, operational & administrative challenges etc. The subsequent sections detail out the solution and scope with respect to each of the solution component. MSI shall note that the activities defined within scope of work mentioned are indicative and may not be exhaustive. MSI is expected to perform independent analysis of any additional work that may be required to be carried out to fulfil the requirements as mentioned in this RFP and factor the same in its response

More specifically, the following will be the activities to be carried out by the MSI:

1. Project Planning, execution and Management

2. Assessment and Gap analysis of requirement for all smart city components under scope.

3. Solution Design, System Customization and development for all components mentioned in this volume.

4. ICT items Procurement, deployment and commissioning

5. Site Preparation including required civil work, LAN Networking

6. Application and general awareness Training

7. Business Process Reengineering for the selected applications/ services, if required

8. STQC Certification

9. UAT & Go live

10. Capacity Building

11. Technical Support

12. Operation & Maintenance (O&M) for 5 Years after complete system go Live date.

belagavi

1 COMMENT

  1. Ramteerth Nagar does not have any smart city resources, no cement road (main road) no RFID for waste management, no water supply and no power cut every 2-3 days.

LEAVE A REPLY

Please enter your comment!
Please enter your name here