fresh fusion

Load Shedding timetable changed: Evening time no power cuts

belagavi

 

Bella Vista Belagavi

The load-shedding timetable has been changed. The hours of power cut remain the same 3 hours, but the power cuts being done in the evening will now be done in the afternoon.

Every Monday the time will be shuffled, like if it was 8am to 10 am this week, next Monday it will be 6am to 8am.

 

Source: Tarun Bharat

SHARE

LEAVE A REPLY