• Skip to main content
  • Skip to primary sidebar
  • News
    • PC Bypoll 2021
    • Loksabha 2019
    • Assembly Elections
      • Search Name in Voters List
      • Know UR Polling Booth
    • Business
      • Startups
    • Letters to Editor
    • Vishwa Kannada Sammelana
    • Education
      • Did u know this
  • Infra
    • Real Estate
  • Lifestyle
    • History
      • Old Photos
      • Then & Now
    • Travel
    • Picnic spots
    • Ganesh Darshan
    • Food & Drink
    • Movies
    • ULB Polls
  • Specials
    • Stars of Belagavi
    • Trivia
    • Sports
  • City Guide
    • Weather
    • Air
    • Train
    • Bus
    • FAQ
    • IT Companies
    • KLE Centenary
    • iamBelagavi
    • Bapu – Bittoo
      • Covid19
  • Food
  • Jobs
  • Tech Meetup
All About Belgaum

All About Belgaum

Belagavi - Belgaum Latest News Online

belagavi
belagavi

Tender for Modern bus station at Belagavi floated again

Aug 14, 2015 by Editor Aug 14, 2015 4 Comments

belagavi

The NWKRTC has floated a new tender for the Construction of Modern bus station along with its subworks at Belagavi.

For which the estimated cost is Rs.28,99,98,997.41. The bid will be opned on 16/09/2015 and after the work order is issued the Time limit for completion (Excluding monsoon) is 24 Months.

The project includes construction of new modern bus station, covered accomodation, Parking Area pavement concrete, City bus shelter, Water supply, Sanitary, Electrical H.T. Works, Wiring, lighting, fire fighting etc., as directed by the Engineer in-charge of work.

In February 2009 a similar Request for proposal was first floated to be built on PPP model but with no bids were received in that format.

In 2010 again similar tender was floated to be built on Lease-cum-Development Format Design-Build-Operate-Transfer (DBOT) basis.

But there were no takers for this plan and even after the RFP/ Tenders were open for two occasions no one actually bid for it.
The current tender does not describe the amenities but the earlier RFP had the following aspects –

The project site (CBT and divisional Workshop) the current bus stand itĀ self. The existing Belgaum Central Bus Station of NWKRTC is located in the heart of Belgaum city on an area of 3.08 acres. The adjacent NWKRTC Divisional Workshop is located on 4.68 acres.

The new bus stand will have 41 bus bays, bus circulation and parking areas, auto-rickshaw lane, taxi parking lane, basement parking for private vehicles, passenger entry/ exit, Terminal building consisting of passenger circulation and waiting areas, ticket/ reservation counters, cloak room, first-aid room, waiting rooms, passenger amenities like drinking water, toilets, yatri nivas etc., restaurant, shops, kiosks and administrative offices, crew restrooms, parcel office and other facilities.

belagavi
Follow us on Google News google news belagavi

About Editor

Writes about the cozy town of Belagavi and captures all the important happenings of the city. Since 2007 have been writing on AllaboutBelagum on varied topics and impactful stories.

Reader Interactions

Comments

  1. C.K.Bedre says

    Aug 17, 2015 at 8:21 PM

    Why it is built on the basis of DBOT? really not getting. almost all bus stands in Karnataka built by govt. fund why not Belgaum bus stand. If no one is coming forward then govt. should fund for this project. Even Hubli,Hassan,Dharwad can be built by Govt. money why not Belgaum.

    Reply
  2. Irfan Mohammed says

    Aug 16, 2015 at 6:41 PM

    How many times we here this TENDER, TENDER, TENDER,,,,,
    Since my childhood am hearing this.
    Is there any End to this ???

    Reply
  3. MS says

    Aug 15, 2015 at 11:47 PM

    Let the NWRTC first remove the hawkers on their boundry wall first who are adding
    tonnes of garbage
    diseases
    Huge traffic due to hawkers
    Dirtiness
    pollution
    then think of something like infrastructure
    these only happens in india

    Reply
  4. nandakishor says

    Aug 15, 2015 at 8:07 AM

    Look at the Infrastructure built in DUBAI we should be ashamed not able to give basic infra

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

belagavi

Search

August 2022
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jul    

About UsĀ  |Ā  Contact usĀ  | AdvertiseĀ  |Ā  Terms