• Skip to main content
  • Skip to primary sidebar
  • Startups
  • News
    • PC Bypoll 2021
    • Loksabha 2019
    • Assembly Elections
      • Search Name in Voters List
      • Know UR Polling Booth
    • Business
    • Letters to Editor
    • Vishwa Kannada Sammelana
    • Education
      • Did u know this
  • Infra
    • Real Estate
  • Lifestyle
    • History
      • Old Photos
      • Then & Now
    • Travel
    • Picnic spots
    • Ganesh Darshan
    • Food & Drink
    • Movies
    • ULB Polls
  • Specials
    • Stars of Belagavi
    • Trivia
    • Sports
  • City Guide
    • Weather
    • Air
    • Train
    • Bus
    • FAQ
    • IT Companies
    • KLE Centenary
    • iamBelagavi
    • Bapu – Bittoo
  • Food
  • Jobs
  • Covid19
All About Belgaum

All About Belgaum

Belagavi - Belgaum Latest News Online

belagavi
belagavi

Work on Railway over bridge on Old PB road soon

Mar 10, 2016 by Uday Mar 10, 2016 Leave a Comment

belagavi

The Railways has floated tenders for the Proposed Construction of ROB 1x24m Composite Girder (Railway Portion) and 4x18m PSC Girder with RE panels (Approach Portion) for four lane traffic at Km.611/900 – 612/000 in lieu of LC No.388 at Belagavi which is OLD PB Road.

old-pb-road-gate-dharwadThe estimated cost of the same is Rs.12,56,32,057 and the time duration for the completion of the work is stipulated to 9 months.

belagavi

The ROB at Kapileshwar LC 385 is 19.5 Crores and the work is in progress but will take at least 2 more months for completion.

It would be very apt for the administration to commence the work on ROB after the work at Kapileshwar is completed.

belagavi
Follow us on Google News google news belagavi

About Uday

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Search

May 2022
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
3031  
« Apr    

About Us  |  Contact us  | Advertise  |  Terms