lcds-Belagavi-news

Construction of footpath and cycle track from Ashoka circle to Surabhi hotel

Photo of author

The Belagavi smart city limited has floated a tender to Construct a non motorised vehicle path (footpath and cycle track) from Ashoka circle to Surabhi hotel stretch via Kanakadas circle at a cost of Rs.6,12,57,000.00 and work has to be completed in 12 months.

The footpath will have 3Mtrs long hot dip Galvanized Conical pole for footpath.

The 2.8 kms Approx stretch will have a footpath and cycle track.

ashoka-dairy

The Footpath and cycle track would be built on both sides of the road to Hotel Surabhi via Kanakdas Circle.

On the one side, there is the lake and it would be a great way to cycle here once the same is ready.

Leave a Comment