Details of the Belagavi Ring road Package wise

Photo of author

CONSTRUCTION OF RING ROAD / BYPASS TO BELAGAVI CITY (Package-1A)

Stretch : Construction of 4/6 lane bypass for Belagavi city from Km 11.00 (Goa side) of NH-4A to Km 516.000 (Pune side) of NH-4 (Design Length 34.48 km) in the State of Karnataka on Hybrid Annuity Mode. (Package 1A)

Length -34.480 Km

Start Point – Ch. 11.00 Km (Goa side) of NH-4A near Zadshahapur Village

End Point – Ch. 516.00 Km (Pune side) of NH-4 near Bennalli Village

Lane Configuration- 4/6 lane divided carriageway with service road

Proposed ROW – 60M

Design Speed – 100 Kmph

Type of Pavement – Rigid Pavement

Land to be acquired (Ha) – 260 Ha

Cost of Land Rs :73 crores

Cost of Land to be acquired (Cr.) – Total Capital Cost (INR Cr.) Per Km Total Capital Cost (INR Cr / km)

*(State Government of Karnataka has allotted 140 Crs towards 50% of total LA cost of the project of length 69.427km)

Total Capital Cost – Rs.1094 Cr

Cost of Land – Rs. 31.70 Cr

ring-road-belagavi

See PDF of the image file

CONSTRUCTION OF RING ROAD / BYPASS TO THE BELAGAVI CITY

Stretch –
1. Construction of 4/6 lane from Km 492.000 of NH-4 to km516.000 of NI-1-4 Via km11 of NFI-4A (Western Bypass) and km492.000 of NI1-4 to km7.5 of SH-54 (Part of Eastern Bypass): Length58.253 km. in the state of Karnataka. (Package -1)

2. Construction of 4/6 lane from km 7.5 of SH-54 to Km 516.000 of NH-4 (Remaining Part of Eastern Bypass). (Package -2)

Length – 69.427 km (Package -1: 58.253 km & Package-2: 11.174km)

Start Point – Package 1: Ch. 492.00 Km of NH-4 near Kamkharatti Village Package 2 – Ch. 7.5 km of SH-54 near Kalkhamb Village

Package 1 – Ch.516.00 km of NH 4 near Bennali Village
End Point – Ch. 7.5 km of SH-54 near Kalkhamb Village
Package 2 – Ch.516.00 km of NH 4 near Bennali Village

Lane Configuration – 4/6 lane divided carriageway with service road

Proposed ROW – 60M / 30M in Package 2 (As alignment traverse through Reserved Forest Area)

Design Speed – 100 Kmph

Type of Pavement -Rigid Pavement

Land to be acquired (Ha) – 550

Cost of Land – Rs :280 crores

Cost of Land to be acquired (Cr.).(State Government of Karnataka has allotted 140 Crs towards 50% of total LA cost of the project of length 69.427km)

Total Capital Cost (INR Cr.) -2792

Per Km Total Capital Cost (INR Cr / km) – 40.24

9 thoughts on “Details of the Belagavi Ring road Package wise”

  1. Ring road is one of the Facilities provided to Belagavi on fast phase as conjestion causing embarshment to the people and visiters to the city.

    The project needs to be taken up on high priority to implement and complete the same for the usage to the public.

    Reply
  2. Hello everyone, this project is a real need of the present situation. If the contact is given to the genuine experienced and well ewuipcontractors, it can be completed in maximum 2 years time if executed seriously considering the need of our lovely Belgaum and Belgaum people.

    Reply
  3. Considering the better development of Belgaum city we badly inneed of a ring road which will improve transportation, check traffic hazards , time saving if one wants to go to other places urgently &potentially of lands falling inside & even outside side of the ring road will also increase. If one is assured of better compensation the land losers may support for ring road. In Karnataka smaller places then Belgaum have ring roads & it’s indicater for improved city. As population increases ,cities go for industrialisation, urbanisation to support that we need ring road for Belgaum.

    Reply
  4. Indeed a very good initiative from the authorities the real challenge is the implementation in a fast phase ,hoping it will be done before 2025 but more efforts required from politicians of belgaum District

    This will really helpful not only for belgaum District but also the connective distircts also

    Thanks in advance to all the people involved in this to make it happen at the earliest planned time phase

    Reply
  5. It’s really need of the hour. With increasing no of veh every day almost all the roads are busy.If Belgaum really want to grow then the better infrastructure is very much essential….
    Accusition of land is important people should co-operate with the Govt agencies….
    Govt must pay handsome price for the land of the poor famers who are totally depends on agriculture as a source of income..
    Good infrastructure is a must to boom the economy of the City….
    You have a case of bye pass in the hand it has gone in litigation…
    We don’t know when will it see the light of the day….

    Reply
  6. Need details of Survey numbers which will be occupied ( acquisition by Govt ) for this ring road project. Please advise on the website or any source to get the survey numbers . thank you

    Reply
  7. How can we. Check the acupied land by gvt for this project cause every one got notice whoever had their land in that area. We haven’t got any notice from gvt

    Reply

Leave a Comment