GR Infraprojects bagged the 2 packages for the Belagavi-Hungund-Raichur section from the National Highways Authority of India (NHAI) and also for the Belagavi Bypass on NH4; Package 1A.
In Belagavi District the highway 9 Belagavi-Hungund-Raichur section) will pass from Bastwad, Tarihal, Chandanhosur, Khamkarhatti, Shaganmatti
The proposed road which starts from Raichur is the same Belagavi-Bagalkot SH but from Yargatti it will divert via Murgod, Inchal, Lakkundi, Bailhongal, Jakkanaikanakoppa.
GR Infraprojects subsidiaries GR Belagavi Raichur (Package‐5) Highway and GR Belagavi Raichur (Package‐6) Highway executed a concession agreement with the highways authority on Tuesday, involving highway projects worth Rs 1,457 crore, according to a regulatory filing.

As part of the agreement, GR Belagavi Raichur (Package‐5) Highway and GR Belagavi Raichur (Package‐6) will undertake construction activities on the Belagavi-Hungund-Raichur section of the National Highway (NH) 748A at bid project costs of Rs 716.5 crore and Rs 740.8 crore, respectively.
Both projects are in a hybrid annuity mode (HAM)—such projects involve a fixed payment for a certain period followed by variable amounts—with a completion period of 730 days and an operation period of 15 years.
Belagavi to Raichur section of NH 748A (Package 5)
Development of 4 lane with paved shoulders from Design Ch. 182.300 to Design Ch. 228.500 in Belagavi – Hungund – Raichur Section of NH748A
Length: 46.20 KM
Belagavi to Raichur section of NH 748A (Package 6)
Development of 4 lane with Paved Shoulders from Design Ch. 228.500 to Design Ch. 273.400 in Belagavi – Hungund – Raichur Section of NH 748
Length: 44.90 KM
Belagavi Bypass on NH4; Package 1A
Development of 4/6 Lane bypass for Belagavi City from Goa Side of NH-4A to Pune Side of NH-4
Length: 34.48 km
Start Point – Ch. 11.00 Km (Goa side) of NH-4A near Zadshahapur Village
End Point – Ch. 516.00 Km (Pune side) of NH-4 near Bennalli Village
Lane Configuration- 4/6 lane divided carriageway with service road
Proposed ROW – 60M
Design Speed – 100 Kmph
Type of Pavement – Rigid Pavement
Land to be acquired (Ha) – 260 Ha
Cost of Land Rs :73 crores