Here is a list of projects which are to be implemented. This are the projects which have been approved and u can also see the current stage at which the projects are.
Currently 18 projects are listed in the database.
The important for Belgaum are the Bus stand modernization, Dharwad- Belgaum railway line, Outer ring road, Multi level car parking and sold waste management.
Power Plant at Vantamuri
The 700 MW gas power based planned in Vantamuri village of Hukkeri Taluka. Construction is scheduled to start in Jan 2013 and project is estimated to be complete in Jan 2016. Estimated cost of the project is Rs.3500 crores.
NWKRTC bus stand development:Â
The development of bus stand is said to be in the Bidding stage but no details are available. The project was bided out in Feb, 2009 & no bid was received due to NWKRTC’s decision to handover Project site II after 2 years. The Project was restructured & formatted as per e-procurement system. Rebidding was invited on 2nd June2010 by e-procurement mode. 2. 2 bids were received & evaluated. The Bid Evaluation summary was briefed to the Transport Secretary, GoK on13th Dec, 2010 3. Decision of NWKRTC Board is pending on approval of the Project.
Dharwad- Belgaum railway line:
Currently Pre-feasibility of the line is being studied. Estimated cost is Rs.375 crores.
Outer Ring Road:Â
Current status of this project is Pr-feasibility. Estimated cost is Rs.300 crores.
The city is well connected to important cities by NH-4, NH-4A, SH-20 (Raicchur-Bachi Road) and SH-54 (Gokak Road) all carrying significant amount of vehicular traffic. Considering that these roads pass within the city limits and there are no truck entry restrictions, traffic volume on city roads is high throughout the day. Thus an outer Ring road approximately 41 km in length is conceptualized to divert the traffic entering the city through NH-4, NH-4A, SH-20 & SH-54.
Multi Level Car Parking:Â
Currently Pre-Feasibility of the project is under Progress. Multi-level car parking at City Centre near Ramdev Galli at Belgaum on PPP basis is planned at an estimated cost of Rs.4.3crores.
Implementation of Intelligent Transport System-Belgaum:
Pre-Feasibility of the project is being studied currently. Estimated cost Rs.110 crores.
Solid Waste Management:
Solid waste/Bio-medical waste/Hazardous waste : Collection, transportation, treatment and disposal facilities will have to made with a capacity of 100 TPD. converting MSW in to manure is also a part of the project.
No. |
Project Name |
Sector Name |
SubSector Name |
Capacity |
Stage Name |
SubStage Name |
---|---|---|---|---|---|---|
1 |
Setting up of 700MW Gas Based Power Project In Belgaum District |
Energy |
Not Available |
700MW |
Bidding |
Bid Submission |
2 |
Development of Modern Bus Station & Commercial Complex at NWKRTC site at Belgaum under PPP basis |
Transportation & Logistics |
Inland water transport Bus/ Truck/ Urban Transport Terminals and associated public facilities such as Public Amenities Centres |
Central Bus Station – 41 platforms & commercial development – 92,000 sq.ft. |
Bidding |
Issue of Letter of Intent (LoI) |
3 |
Agri Infrastructure |
Agriculture and horticulture markets |
Bidding |
Bid Submission |
||
4 |
Transportation & Logistics |
Railway systems |
Project Identification |
Pre-feasibility |
||
5 |
Development of Gotur – Kagewad section of SH-12, SH-44 & SH-53 in Karnataka |
Transportation & Logistics |
Roads (including bridges, interchanges, and flyovers) |
60.72 |
Project Development |
Detailed Project Report (DPR) |
6 |
Improvements to Jath Jamboti road (SH-31)from Ch. 25.000 to 101.000Km |
Transportation & Logistics |
Roads (including bridges, interchanges, and flyovers) |
76 Kms |
Bidding |
RFP Finalization |
7 |
Development of road Kudchi – Gataprabha(Kudchi-Raibagh-Gataprabha) |
Transportation & Logistics |
Roads (including bridges, interchanges, and flyovers) |
50 |
Project Development |
Detailed Project Report (DPR) |
8 |
Transportation & Logistics |
Roads (including bridges, interchanges, and flyovers) |
Project Identification |
Pre-feasibility |
||
9 |
Transportation & Logistics |
Mechanised and Multi-storey Parking facilities |
Project Identification |
Pre-feasibility |
||
10 |
Transportation & Logistics |
Transportation |
Project Identification |
Pre-feasibility |
||
11 |
Development of Way-side Facilities in the Tourist Circuit – Belgaum – Bijapur |
Tourism |
Not Available |
Project Identification |
Pre-feasibility |
|
12 |
Transportation & Logistics |
Railway systems |
Project Identification |
Pre-feasibility |
||
13 |
Improvement of road from Sankeshwar-Yeragatti Via Gokak (SH-44 & 45) |
Transportation & Logistics |
Roads (including bridges, interchanges, and flyovers) |
73 Kms |
Project Identification |
Pre-feasibility |
14 |
Upgradation of 1396 Governemnt ITIs Through Public Private Partnership, Saundatti |
Education |
Infrastructure and facilities for educational institutions, not on a purely commercial basis, but which satisfy a Public Need |
5061 Sq.m. |
Operation |
Operation year 3 |
15 |
Upgradation of 1396 Governemnt ITIs Through Public Private Partnership, Udyambag ITI |
Education |
Infrastructure and facilities for educational institutions, not on a purely commercial basis, but which satisfy a Public Need |
3 Acres 10 Gunthas |
Operation |
Operation year 3 |
16 |
Urban and Municipal Infrastructure |
Commercial development with common-user facilities |
Project Identification |
Pre-feasibility |
||
17 |
Establishment of MRI Centres in Medical College Hospital, Belgaum |
Healthcare |
Infrastructure and facilities for healthcare, not on a purely commercial basis, but which satisfy a Public Need |
Project Identification |
Pre-feasibility |
|
18 |
Urban and Municipal Infrastructure |
Solid waste/Bio-medical waste/Hazardous waste : Collection, transportation, treatment and disposal facilities |
100 TPD |
Operation |
Operation year 3 |
Source: PPP Karnataka Database
I have the same info , but sorry to see the fact that most of the projects are still in Pre-feasibility
state eventhough they are very strongly needed, unfortutantely there is no strong politicians or gutsy politicians from Belgaum to execute these..CM Gowda I am not sure excpet smile he would hardly do anything for Belgaum.
he can do one more thing of filling his treasure on wife/daughters/sons name —
do we have choice ? we already elected them, we dont have right to ask them now
Very nice report… Keep updating
Very nice report.. Very informative. Keep updating
Good report and wonderfully written and very knowledgeable to citizens of Belgaum. I really wonder even if our MLA’s or MP’s know about this present situation towards the development of Belgaum. At least these projects are to be kept in front of them and ask them about it and what have they done towards it. They are only busy filling their pockets and may be thinking of how to win next assembly elections which is almost in a years time or so. Is it any way for us to do something and speed these projects for Belgaum.
Some of the other projects mentioned areus Terminal/Multi Modal Hub Belgaum
(opposite Railway Station)
Urban Infrastructure
;Parking Facilities
Solid Waste Management
Underground Drainage Scheme for Sankeshwar ,
29 DMA Underground Drainage Scheme forHukkeri
19 DMA Underground Drainage Scheme for Sadalga
24 DMA 24X 7 Water supply on PPP basis for Belgaum
Wine Park in Krishna Valley near Athani
Belgaum Agri Infrastructure Investment Region,
as mentioned in http://www.advantagekarnataka.com
http://www.advantagekarnataka.com/images/district-profiles/Belgaum.pdf
Well we the Belgaumits know these projects and their importance. Is our elected MLA’s and MP’s know these projects and their status????? They are still busy in cricket tournaments, kite shows and some are in organizing the Holi dance shows etc these are just show-off things which we don’t want.
We want the status of these projects to turn into green and completed one as soon as possible. Otherwise They won’t get elected in future. JANATA JAAG CHUKI HAI…… Let them show their efforts in the completing the all above projects before the next election to keep the alive their faith..and become HERO in public otherwise they will definitely going to loose next election…… If they have anything called “SHAME” then let them finish above projects in their elected time period/duration…. otherwise they will beg votes for next election on the same topics. Don’t give such second chance to them. This will be their last chance to prove their capability…….