• Skip to main content
  • Skip to primary sidebar
  • News
    • PC Bypoll 2021
    • Loksabha 2019
    • Assembly Elections
      • Search Name in Voters List
      • Know UR Polling Booth
    • Business
      • Startups
    • Letters to Editor
    • Vishwa Kannada Sammelana
    • Education
      • Did u know this
  • Infra
    • Real Estate
  • Lifestyle
    • History
      • Old Photos
      • Then & Now
    • Travel
    • Picnic spots
    • Ganesh Darshan
    • Food & Drink
    • Movies
    • ULB Polls
  • Specials
    • Stars of Belagavi
    • Trivia
    • Sports
  • City Guide
    • Weather
    • Air
    • Train
    • Bus
    • FAQ
    • IT Companies
    • KLE Centenary
    • iamBelagavi
    • Bapu – Bittoo
      • Covid19
  • Food
  • Jobs
  • Tech Meetup
All About Belgaum

All About Belgaum

Belagavi - Belgaum Latest News Online

belagavi
belagavi

Work on Belagavi Panjim NH4A widening commences

Aug 24, 2018 by Editor Aug 24, 2018 3 Comments

belagavi

The long-awaited widening of the Belagavi to Goa via Khanapur has commenced near Desur Cross, currently, the only land where there are no crops is been flattened and work will pick up pace after the rains the contractor said.

NHAI has awarded the tenders to two firms for Phase 1 and Phase 2. Both will have one toll plaza.

Belagavi-Khanapur Section
4 Laning of Belagavi-Khanapur Section (Km 0.000-Km 30.800) (Design Chainage Km 0.000 to Km 30.000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode(Package I) has been awarded to M/s Ashoka Concessions Ltd.
Length: 30 Km
Cost: 856.20 Crores
Toll Plaza: Km 19+200

nh4a widennh4a

Khanapur – Anmod Section
2 Laning with paved shoulder from 30+800 to 70+800 km and 2 laning without paved shoulder from 70+800 to Karnataka/Goa border 84+120 Km has been awarded to M/s Dilip Buildcon Ltd.

Length: 52.3 Km

Cost: 486.78 Crores

The upgradation of the existing road to entirely 4 lane is affected by the restriction of available land due to both protected and non-protected forest patches along the project corridor. The available RoW (Right of Way) and the proposed sectional width have been proposed as follows:

From 0 to 15.4 KM Proposed width 60 M – Private Land
From 15.4 to 22 KM proposed width 45 M – Non-Protected forest with intermittent private land
From 22 to 27.9 KM proposed width 60 M – Private Land
From 27.9 to 30 KM proposed width 45 M – Non-Protected forest land

 

belagavi

Tags: nh4a

Follow us on Google News google news belagavi

About Editor

Writes about the cozy town of Belagavi and captures all the important happenings of the city. Since 2007 have been writing on AllaboutBelagum on varied topics and impactful stories.

Reader Interactions

Comments

  1. S GR Kulkarni says

    Sep 21, 2018 at 7:09 PM

    Our BSNL OFC nld cables connecting Goa traffic will be damaged affecting otn n 10g traffic gps Bts all will be affected Sde od2 belagavi

    Reply
  2. Mohammed Altaf Sheikh says

    Sep 14, 2018 at 11:22 AM

    Goa is frequently visited by Belgaumites and its wonderful that the road to Goa is widening into two lanes this certainly will make easy and safe to travel.

    Reply
  3. Vinod says

    Aug 24, 2018 at 3:17 PM

    Everywhere road widening but corporation and cantonment forget to main road in the belgaum SANCHAYNI CIRCLE TO GOGTE CIRCLE, camp road widened first. all the way from globe to Petrol pump camp is very small road on both sides of the divider. Its a traffic hazard. they are making road in street area but they forget main road in the belgaum where traffic are more, I think because of political pressure. ramlingkhind galli, ramdev gali, very small small area where they are made master plan but y they are forget this road????? actual the road is required 120 feet because of current traffic in this road. our request is to please make the road 120 feet from SANCHAYNI CIRCLE TO GOGTE CIRCLE, camp.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

belagavi

Search

August 2022
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jul    

About Us  |  Contact us  | Advertise  |  Terms