Bharat Electronics limited which was awarded the contract to build the Command center for the Belagavi smart city for Rs.46 crore is making good progress at Vishveshwaraya Nagar.
The command center will be one place from where traffic, CCTV, Power, street lights and other services would be integrated into a single command room.
Master System Integrator (MSI)/System Integrator (SI) to implement the said ICT interventions.
Level1: Integrate and View
City Surveillance & Ambulance & Fire
2. Level 2: Integrate, Command and Control
1. E-governance (Property Tax, Automatic Building Permission Approval System, birth and death registration, public grievance redressal system, fund-based accounting system (etc)-Present integration 2. Smart Parking (for future integration)
3. Smart Lighting (for future integration)
4. Smart UGD (for future integration)
5. Smart Energy Management (for future integration)
6. Geospatial Database Management (including Land Management System and Utilities Mapping )-Present Integration
7. Fire &Ambulance
Level 3: Implement, Command, Control and Fully Operate
1. Smart Water
2. ICT based solid waste management with RF at household and community level
3. Intelligent Traffic Management System (Adaptive Traffic Control System)
4. Intelligent Transport System (ITS)
5. Intelligent Pole (with environmental sensors, public address system, variable messaging system, digital billboard, panic button).
After establishing the above said solutions, the bidder is expected to Operate and Maintain the said ICT interventions for a period of 5 years
Main objective of the project is to break silos in the city with in the departments and across the departments. Also to install appropriate check points for solutions implemented, so that the services delivered to the public are to the at most satisfaction of public. SI shall be responsible to carry out the detailed survey prior to submission of bid for the complete solution component requirement in order to finalize infrastructure requirement, network bandwidth requirement, operational & administrative challenges etc. The subsequent sections detail out the solution and scope with respect to each of the solution component. MSI shall note that the activities defined within scope of work mentioned are indicative and may not be exhaustive. MSI is expected to perform independent analysis of any additional work that may be required to be carried out to fulfil the requirements as mentioned in this RFP and factor the same in its response
More specifically, the following will be the activities to be carried out by the MSI:
1. Project Planning, execution and Management
2. Assessment and Gap analysis of requirement for all smart city components under scope.
3. Solution Design, System Customization and development for all components mentioned in this volume.
4. ICT items Procurement, deployment and commissioning
5. Site Preparation including required civil work, LAN Networking
6. Application and general awareness Training
7. Business Process Reengineering for the selected applications/ services, if required
8. STQC Certification
9. UAT & Go live
10. Capacity Building
11. Technical Support
12. Operation & Maintenance (O&M) for 5 Years after complete system go Live date.
When there are no traffic signals,street lights what you are going to control. Our sincere request is to start the services first and then think of controlling the same by spending such a huge amount
Many of the smart city projects are slow in progress are they not time bound? Are the official not aware why is there no coordination between the contractor and the official
You are making the people of Belagavi look like buffoons