• Skip to main content
  • Skip to primary sidebar
  • News
    • Loksabha 2019
    • Assembly Elections
      • Search Name in Voters List
      • Know UR Polling Booth
    • Business
    • Letters to Editor
    • Vishwa Kannada Sammelana
    • Education
      • Did u know this
  • Infra
    • Real Estate
  • Lifestyle
    • History
      • Old Photos
      • Then & Now
    • Travel
    • Picnic spots
    • Ganesh Darshan
    • Food & Drink
  • Movies
  • Specials
    • Stars of Belagavi
    • Trivia
    • Sports
  • City Guide
    • Weather
    • Air
    • Train
    • Bus
    • FAQ
    • IT Companies
    • KLE Centenary
    • iamBelagavi
    • Bapu – Bittoo
  • Food
  • Jobs
All About Belgaum

All About Belgaum

Belagavi - Belgaum Latest News Online

belagavi

Smart city command centre making good progress

Sep 22, 2019 by Editor 2 Comments

belagavi

Bharat Electronics limited which was awarded the contract to build the Command center for the Belagavi smart city for Rs.46 crore is making good progress at Vishveshwaraya Nagar.

The command center will be one place from where traffic, CCTV, Power, street lights and other services would be integrated into a single command room.

belagavi

Master System Integrator (MSI)/System Integrator (SI) to implement the said ICT interventions.

Level1: Integrate and View

City Surveillance & Ambulance & Fire

2. Level 2: Integrate, Command and Control

Smart city command centre1. E-governance (Property Tax, Automatic Building Permission Approval System, birth and death registration, public grievance redressal system, fund-based accounting system (etc)-Present integration 2. Smart Parking (for future integration)

3. Smart Lighting (for future integration)

4. Smart UGD (for future integration)

5. Smart Energy Management (for future integration)

6. Geospatial Database Management (including Land Management System and Utilities Mapping )-Present Integration

7. Fire &Ambulance

Level 3: Implement, Command, Control and Fully Operate

1. Smart Water

2. ICT based solid waste management with RF at household and community level

3. Intelligent Traffic Management System (Adaptive Traffic Control System)

4. Intelligent Transport System (ITS)

5. Intelligent Pole (with environmental sensors, public address system, variable messaging system, digital billboard, panic button).

After establishing the above said solutions, the bidder is expected to Operate and Maintain the said ICT interventions for a period of 5 years

Main objective of the project is to break silos in the city with in the departments and across the departments. Also to install appropriate check points for solutions implemented, so that the services delivered to the public are to the at most satisfaction of public. SI shall be responsible to carry out the detailed survey prior to submission of bid for the complete solution component requirement in order to finalize infrastructure requirement, network bandwidth requirement, operational & administrative challenges etc. The subsequent sections detail out the solution and scope with respect to each of the solution component. MSI shall note that the activities defined within scope of work mentioned are indicative and may not be exhaustive. MSI is expected to perform independent analysis of any additional work that may be required to be carried out to fulfil the requirements as mentioned in this RFP and factor the same in its response

More specifically, the following will be the activities to be carried out by the MSI:

1. Project Planning, execution and Management

2. Assessment and Gap analysis of requirement for all smart city components under scope.

3. Solution Design, System Customization and development for all components mentioned in this volume.

4. ICT items Procurement, deployment and commissioning

5. Site Preparation including required civil work, LAN Networking

6. Application and general awareness Training

7. Business Process Reengineering for the selected applications/ services, if required

8. STQC Certification

9. UAT & Go live

10. Capacity Building

11. Technical Support

12. Operation & Maintenance (O&M) for 5 Years after complete system go Live date.

belagavi
Follow us on Google News google news belagavi

Reader Interactions

Comments

  1. Chaman says

    Sep 26, 2019 at 6:43 AM

    Many of the smart city projects are slow in progress are they not time bound? Are the official not aware why is there no coordination between the contractor and the official
    You are making the people of Belagavi look like buffoons

    Reply
  2. SHRINIVAS says

    Sep 23, 2019 at 2:04 PM

    When there are no traffic signals,street lights what you are going to control. Our sincere request is to start the services first and then think of controlling the same by spending such a huge amount

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

belagavi

Belagavi COVID 19 Update

Updated on 03/01/2021
New Cases
13

Recovered


21
TotalAAB
Active  Cases
187
Deaths
342

COVID Helpline Numbers
belagavi For Admissions Click here

Search

January 2021
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Dec    

About Us  |  Contact us  | Advertise  |  Terms