• Skip to main content
  • Skip to primary sidebar
  • News
    • Loksabha 2019
    • Assembly Elections
      • Search Name in Voters List
      • Know UR Polling Booth
    • Business
    • Letters to Editor
    • Vishwa Kannada Sammelana
    • Education
      • Did u know this
  • Infra
    • Real Estate
  • Lifestyle
    • History
      • Old Photos
      • Then & Now
    • Travel
    • Picnic spots
    • Ganesh Darshan
    • Food & Drink
  • Movies
  • Specials
    • Stars of Belagavi
    • Trivia
    • Sports
  • City Guide
    • Weather
    • Air
    • Train
    • Bus
    • FAQ
    • IT Companies
    • KLE Centenary
    • iamBelagavi
    • Bapu – Bittoo
  • Food
  • Jobs
All About Belgaum

All About Belgaum

Belagavi - Belgaum Latest News Online

belagavi

Underground Garbage bin soon in Belagavi

Feb 17, 2021 by Editor 1 Comment

belagavi

The Belagavi city corporation has floated a tender for installation of a 14cum refuse compactor with crane for underground container.

As per the documents attached to the tender, one such is planned in Belagavi (South) as the tehnder has been floated by EE South.

belagavi

Supply & installation of 1.1 cum capacity dust bin with full overhead cover and on the top SS304 decorative bin – Qty 1

Supply of 14 cum compactor with crane for lifting hydraulic dust bins – Qty 1

Estimated Contract Value – 4951180

Photo from Surat – Courtesy https://www.thebetterindia.com/148614/surat-underground-garbage-system/

Unlike many leading metros that continue to grapple with issues of overflowing public dump yards, exhausted landfills and foul air, Surat has installed 43 underground garbage bins to manage its waste.

With a capacity of up to 1.1 tonnes of waste each

The bins have been installed on footpaths. Each of them has two openings or inlets. One is for individuals to throw waste, another is for the municipal carts that bring collected waste.

These humongous metal bins are being lifted with the assistance of cranes, thus emptying the entire waste mechanically, without any direct human involvement.

The City corporation has floated tenders for
Supply and installation of conveyor belt system for dry waste segregation unit to City Corporation – Qty 1 cost 65 lakhs

Supply and installation of 5 tonne capacity Biogas (biomethanisation) plant at City Corporation Belagavi – Estimated Contract Value- 13000000

Inputs from – https://www.thebetterindia.com/148614/surat-underground-garbage-system/

belagavi
Follow us on Google News google news belagavi

Reader Interactions

Comments

  1. Vijay mane says

    Feb 17, 2021 at 10:24 PM

    Sir, I have something which can decompose any organic material within 25 days, which will drastically reduce dumping yard by more than 50%, and which will cost you less than 100 for a tun of material.
    It can also be added to underground bins so that you can directly get compost after a month.
    Inform me if you are interested in it
    Mob no :- 8861400719

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

belagavi

Search

February 2021
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
« Jan    

About Us  |  Contact us  | Advertise  |  Terms